OTTO Arena System GmbH at work!

From Gundi Younger.
1.25” of rain practically overnight. 24 hours between photos.

Tony Judge at Olympia Footing built an amazing arena using the OTTO Arena System GmbH Base Mats and footing provided by Premier Equestrian for us. Are you able to ride right after the rain?
If the answer is no then give our Project Coordinator Michael a call at 707-331-5915 and let’s see how we can create the best riding surface possible for you and your horses!

Schedule Your Consultation Today